The full turnkey refurbishment package from initial design through to the delivery of the project included all electrical and mechanical works.
The site has a fresh look to their washrooms, changing to gender neutral cubicles minimising the risk of bullying, reducing the carbon footprint and improving hygiene standards.
Take a look at how we can transform your washroom facilities:
#360commercialprojectslimited#construction#interiordesign#design#fitout#education#educationdesign#educationarchitecture#nottingham#washrooms#washroom