External work is nearing completion and the new reception area is now water tight.
Time to make the finishing touches to the external front elevation and begin the internal fit out, not long to go now!
#360commercialprojectslimited#construction#interiordesign#design#fitout#education#educationdesign#educationarchitecture#furniture